Color: from white to gray
Using temperature: from +5 ° C to +45 ° C *
Ballon temperature: from +15 ° C to +25 ° C
Film formation time: 3-5 min. **
Preliminary time? Processing: 20-40 min. **
Full staining time: 3 hours
Thermous?
Density: 20-25 kg/m3
Size stability (shrinkage): 3 - 5% ***
Water absorption: 1.5% (after 24 hours)
Compression force: 0.03 MPA
Stretching force: 0.14 MPa
Thermal conductivity: 0.032 W/m*K
Solvents (before foam hardening): Polynor Cleaner
* (optimum temperature +23 ° C)
** (at a temperature of +23 ° C and air humidity 35%)
*** (at a temperature of +23OC, air humidity 35%, within 24 hours)
High performance - more than 65 liters
Excellent adhesion to a large spectrum of building materials
Homogeneous, fine -handed structure
High acoustic and thermal insulation
The start of cutting is 20-40 min.
Foundations for mold and moisture
Distinctive feature - density of 20-25 kg/m3
Secondary extension up to 25 %
Shelf life - 18 months