- All orders
- Materials for road construction
- Materials are required for road construction, in … (№ 1369802)
Order completed
Offers are no longer accepted.
Show previous order
Order no 1369802
Order completed
0 - $1,500
Materials are required for road construction, in …
Materials are required for road construction, in the following positions:
1. Bitumen road emulsion (consumption 0.4 liters per 1 m2, weight 1 liter = 1.05 kg) - 0.081052 tons;
2. Bitumen road emulsion (consumption 0.9 liters per 1 m2, weight 1 liter = 1.05 kg) - 0.182366 tons;
3. Bitumen mastic, consider different brands - 1,8494 tons;
4. Bitumen is hot, consider different brands - 0.1232 tons.
The emulsion is necessary for a device for coating hot asphalt concrete mixtures with pavers. Mastic and bitumen are needed for waterproofing the side coating bitumen on the leveled surface of rubble masonry, brick, concrete.
We accept information about the cost of materials and the terms of their delivery in text form.
Commercial offers are mainly of interest from suppliers from Orenburg.
Delivery to Orenburg
Category
I consider suppliers from
Orenburg
Delivery in
city
Orenburg
78
Order views
Show the following order
Similar ordersOrder categories Orders that have the same categories as an open order
Order no. 1789353
$4,000 - $15,000
Any other questions?
Give your phone number and we will call you back.